Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / keyur donga
when the main steam temprature is goes high At varying load of the HRSG At this this time We maintain the Steam temp by using attempration in HRSG.
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
explain how the third harmonic content of the magnetising current affects transformer design
operation
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
what is natural frequency of turbine shaft .
procedure of how to generate power in solar plant.
How We Calibrate the vaccum transmitter?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what is the trip circuit supervision in an electrical meaning?
what is restricted earth fault explain in details
What is difference between secondary Air & Tertiary Air and Their use.?
what is the basic use of power plant in equipment
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
Why superheated are started before I'd and rd fan?
By any way can we increase the B check hours from 300 to 500