Answer Posted / ayaz
PTW stand for PERMIT TO WORK
1-cold permit
2- spark/hot permit
3- vehicle entry permit
| Is This Answer Correct ? | 8 Yes | 9 No |
Post New Answer View All Answers
please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...
Q-Explain the different load conditions that will produced different offset which may or may not be acceptable to thhe control function
Draw a simple circuit for a well head control panel used to protect the well against fire, leak, blockage, ESD, & controls the operation of one downhole & one surface safety valve. Explain the operation and controls
Explain the working principle of lvdt?
how to do dynolab wind speed sensor loop test, how to simulate value,i have simulate mA 4-20mA but not responding in DCS faceplate, please kindly advice me any one.
What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.
What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.
Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.
what is the advantage of submersible level transmitter compare to ultrasonic level transmitter?
draw shematic diagram of c/v positioner(smart type)?
In turbine what does term CDP, NH, HSSOC means.
How to calibrate capillary type level transmitter
What is Positive Calibration and Negative Calibration?
please send the drdo exam paper
Why trim span ? How?