ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need
Answer Posted / shariff
4.28 Cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what are the phases inspections are done by local authority while construction?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
residential projects,structural.
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what are the ffactors you considered choosing the course?
what is the hanekom repairing material after concreting work
I need old MMUP exam question and answer for Civil engineering
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
How to cal. The weight of hollow pipe?
What in bending moment, if a moment is free end of cantilever beam?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.