clear cover means the distance between main bar outer face to shuttering face. Is it right?
Answer Posted / madhusudhan
Yes
Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
What quantity of 1.0 m3 bricks required?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
how can we construct building without foundation providing only grade beam at ground level
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
What is the worlds largest concrete dam?
How we calculate the service time of buildings
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what are the code used for residental building?
What is the Hardness of M-40 grade concrete, general and theoratical
reinforcement slab, beam and column formulas?
What is Rankine Cycle?
What are the joints wants to made in masonry where door opening, arches like etc..
How many days should curing of plastering, brick work and concrete
how to identify the failure of building by expansive soils