clear cover means the distance between main bar outer face to shuttering face. Is it right?

Answer Posted / madhusudhan

Yes

Is This Answer Correct ?    12 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What quantity of 1.0 m3 bricks required?

668


how much quantity of cement,sand and water required for 1 sq feet flooring work .

2002


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1037


how can we construct building without foundation providing only grade beam at ground level

1079


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1663






What is the worlds largest concrete dam?

717


How we calculate the service time of buildings

1436


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1300


what are the code used for residental building?

2056


What is the Hardness of M-40 grade concrete, general and theoratical

1669


reinforcement slab, beam and column formulas?

2202


What is Rankine Cycle?

669


What are the joints wants to made in masonry where door opening, arches like etc..

1292


How many days should curing of plastering, brick work and concrete

1216


how to identify the failure of building by expansive soils

1236