Pl answer. when we deduct 2d for cutting length of 90deg
bend, whats the method of booking measurements as per IS
code? whether cutting Length to be booked or something else?
Answer Posted / kannan t
As per IS 1200-8, cutting length after deductions shall be measured for payment
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is oneside mat. And explain
Explain the water bound macadam roag
what are the duties of Site Engineer in work site?
What is Heavy Concrete & Normal Concrete
What is the diff between cad & cadd?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
why we are useing plastic under the lean concrete?and whts the advantage?
how to clculate the %of concrete strenght achive after curing?load
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how much shouid be the rate for ready mix concrete per cubic meter
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
how to find hardness of water?why it should be determined?