calculation of quantities of cement and sand in 1cum mortar
with 1:6 ratio
Answer Posted / balachandra mahendra
cement=6.514bags
sand=1.3028cum
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the difference between absorption & adsorption and sorption?
Sir how to find cutting length for footing steel bars in the shape of "u"
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is rolling stock
How to find the cuplock pipe qty in staging for Minor bridge?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
115mm thickness brick work how to required mortar
How many % we consider for lap for reinforcement for estimates
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
How much of the strength of concrete comes from post- production curing?
In the roof of a pumping station explain briefly the components of a waterproofing system?
how much to get of BRC lapping in full yield and half yield ?