Answer Posted / sfz ans
Its REFUGE AREA. Designed to hold occupants during a fire or other emergency. It faces towards the portion of a building from where the fire trucks are expected to rescue people. Generally in high rise, every fourth floor is expected to have a refuge area.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
how many cement used in single story residential building per sqft
3. What are the disadvantages of your present job, things you do not like about it?
what is the meaning of 40/20 src
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
how do you stabilize a waterlogged area in road construction
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is binding spacing of the rebars at lapping zones.
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What does civil engineering mean?
What is Heavy Concrete & Normal Concrete
Which is stronger solid steel rod or hollow steel pipe?
how we can find sieve #4 is 4.75mm?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.