Post New Answer View All Answers
what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering
what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer
what is high - pot test. what's its use?????
before synchronizing an alternator,power factor is leading ,why?
can i use 2000/5A Clamp meter to measure HT cable
what are the 4 rules to start the motor?
what's the difference between abs/inc encoders. apart from the position remembrance what are all the other differences. and what's mean by grey code.
What is Load sharing of Transformer ?
HOW TO CALCULATE THE REGULATION OF 100 AND 25 KVA TRANSFORMER
can we synchronize star system generators with delta system transmission line ? and how ?
What is measurement?
what is the working principle of energy saver control panel. please give the complete calculation & theory.
Define super node?
WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?
How to calculate cable size by using load.?? Any formula...