i have a material change material description how to trigger
idoc?
Answer Posted / senthil
1.GO TO BD52 AND ACTIVATE CHANGE POINTER FOR THE PARTICULAR MESSAGE TYPE WHICH YOU ARE USING.
2.THEN GO TO BD21 AND GIVE THE MESSAGE TYPE AND RUN THE REPORT THIS WILL AUTOMATICALLY GENERATE AN IDOC WHICH CONTAINS THE CHANGES.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What do the business process harmonization service do?
what are the advantages and disadvantages of ale?
Explain the multiple messages in idocs?
Can we send the idoc to multiple sub systems?
Differentiate between synchronous and asynchronous links.
How idoc is posted to r/3 system?
How would you handle idoc errors using messages?
What is the main difference between interfaces and xi, I think both are cross-applications right?
Explain the idoc base in idocs?
What is a Port? What are the types of Ports?
What happens in the inbound process?
How to debug idoc manually?
What do the consistency checks service do?
What is a message control in sap?
Explain the data records in idocs?