Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why elcb used in circuit

Answer Posted / priyanka r

ELCB is connected during earthing installation to detect even the small leakage of current in the circuit.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Diagram on interconnectivity of 11kv transformer with RMU (i.e, one incoming and two outgoing or two incoming and one outgoing)

2717


typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?

1720


How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?

2173


How can we calculate the transformer rating if the load calculated is 1000KW (11Kv Supply)?

1070


what is the circutor?why we use it ?

2321


i want to know that how the height of Ct ,cvt ,LA calculated on the basis of creepage distance

2603


I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?

3806


what purose of the double circuit transmission line phase of the line phase changed for circuit-1 for Circuit-2 R-Y-B B-Y-R

2277


What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

2673


what are the difference between PLC and embedded

2141


how do i commission a distribution transformer knowing all its ratings and transformation ratios?d

4569


What is the effect of interchanging core(made of steel) and winding(made of copper) material in case of transformer? Give proper explanation in regard to different losses in transformer.

1871


what is your aim

1908


What is the breaking capacity of transformer and how can we calculate the breaking capacity of tranformer

1930


write encoder 17 pins details? pin a;b+, pin b;w+,..pin s & t. what is the meaning of b+, w+? explain;

2145