plz. how many times required for compacting subbgrade in road
way & how many water required?
Answer Posted / trsh123
it's depends on the thickness of the Sub grade ..u keep to maintain sub grade thickness per layer 0.3meter after compaction
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
List out some of the software program that can be useful for architect?
pls give me some basic informations in construction of a structure?
how many litres of enamel paint required for 5000 sft of site??
What are the different methods for drawing an arc?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What is the cost difference between site mix and ready mix concrete per cubic meter
For a washout valve why are two gate valves required in normal practice?
What is meaning of FREE STANDING STAIRCASE ?
What do you mean by bond? What are the different types of bonds?
Which architectural movement is also known as jazz moderna?
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
what is the formula to find the diagonal shape stirrups?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
how water proof chemicals act in concrete to avoid leek?
What is the strength of 1:6:12 mix?