plz. how many times required for compacting subbgrade in road
way & how many water required?

Answer Posted / trsh123

it's depends on the thickness of the Sub grade ..u keep to maintain sub grade thickness per layer 0.3meter after compaction

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

1806


In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed

2704


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

1884


how much shouid be the rate for ready mix concrete per cubic meter

1467


Define Who designed the city of Washington DC?

639






what are the five benefits of using standard terminology in the measurement process?

1669


What is reinforced concrete?

691


What is meant by solid geometry?

648


what is the difference between tsp & tower

1709


If specific gravity of cement is less than 3.15 what is the cause?

1872


How can I make justification between using concrete grade c35 compare c37?

1096


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

4218


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1896


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1382


How to do base isolation using ETABS software?

2488