plz. how many times required for compacting subbgrade in road
way & how many water required?
Answer Posted / trsh123
it's depends on the thickness of the Sub grade ..u keep to maintain sub grade thickness per layer 0.3meter after compaction
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is quantity of cement and sand required for 2000sqft of tiling?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What do you mean by the word 'shear'?
is basic cost of the material includes tax?
whats is difference between anchorage length and development length
Define What happens to Load at yielding ?
undistributed samples are obtained by
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is the distance between railway tracks?
rate analysis for cement pointing 1:4 , for 100 sq m
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.