Why do we provide development length in RCC?

Answer Posted / sfz ans

to induce/ transfer stresses from one bar to another or one section to another so that it can act as a homogenous structure

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What are the uses of alloys in daily life and how are alloys made?

738


Consumption of Binding wire for fixing of cover block in vertical surface

1049


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1510


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4162


How much material is required for constructing a 2 Lane 2Km rigid pavement road

1736






What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2607


what is total volume of ingredients used in concrete accordingly

1812


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

3796


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1551


Formula for calculating the volume of bulb in underreamed pile

4409


Explain creep?

695


How to calculate 1 brss for RCC work  

1617


What is the difference between routing maintenance and major maintenance in school facilities?

669


explain the advantages of total stasion

1687


What is the difference between yeild strength and compressive strength of steel???

1794