What is the maximum allowable 'Silt content' in River sand
Answer Posted / deepak singh
by volume 8% and by wt. 3%
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is critical path method (c.p.m)?
how much cement and sand required for 1cum rr masonry
Define What is made from large rocks, which protects the base of cliffs?
satart to end steps by step process of building construction...? i want to planning theme accuretly
in the earthquqke the profile of water on dam is parabolic or not
What type of tensile strength is handling by crank in beam? Thanks.
What is Time period of a building and its relation with frequency ?
what are the duties of Site Engineer in work site?
what is the relation between pitch of steel and depth of slab?
How do you determine specific gravity of cement?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Tell me about triple point of water.
how to clculate the %of concrete strenght achive after curing?load
What is Density of cement, sand & aggregate ?