Answer Posted / ashok mishra
dc series motor are used but now a day ac series motor are using in nwe loco
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to work meggar?
Dear all, I just want to ask an expert on this forum for some insights. For the magnetic balance test, when applied voltage on a Delta-Star transformer e.g. Dyn11, the following relationships apply for HV side: 1. H1-H2 = H2-H3 H3-H1 2. H2-H3 = H3-H1 H1-H2 3. H3-H1 = H1-H2 H2-H3 For the LV side also: 4. X1-X0 = X2-X0 X3-X0 5. X2-X0 = X3-X0 X1-X0 6. X3-X0 = X1-X0 X2-X0 Is there a similar pattern for Y-d, Y-Y, D-d? And how about Y-z, D-z, Z-y transformers? I've tested a YNzn5 transformer and for LV side I don't see the pattern. In this particular case I got for LV side the following (see values below): H1-H0 H2-H0 H3-H0 X0-X1 X0-X2 X0-X3 128.0 119.9 7.2 29.2 13.3 15.8 70.7 128.4 59.2 23.4 22.0 3.6 7.2 120.1 128.1 13.4 29.3 15.8 What is the relationship here for LV? For row 1 I see the relationship, for row 3 I also see but it's shifted, but for row 2 I don't see such relationship. Any suggestions, answers, someone?
How will change the frequency in distribution side?
what is a types of short circuit and what is a types of distance protection tests
HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com
explain with diagram how to protect transformers and substations from over current with help of CT's?
Please define ohm’s law for a.c (alternating current)?
What is the angle of inclination for the oil connection from transformer conservator to Bucholz relay and why?
DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?
How i can decide that HVDC line is best for transmission.
how much LT load can bear by the 100 KW HT connection.
How much load can take a 16 mm aluminum cable 3 phase
What are the specifications for conducting earth leakage test as per IEC standard?
Why we specify TNC switch with 1NO 1NC ,2NO 2NC ? how we get connection.?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.