Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how sir calculate the slab steel and sir i want to know
that how i calculate shutter works payments in cum and the
rate is 120 per cum

Answer Posted / venu gopal

Generally shuttering will calculate in SQm/SQft . First u have to know the Dimensions of the member (column/beam etc..) then calculate the area of the member ..that area multiplies with thichness wii gives u the Volume of shuttering

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I what know about life time of frp tank plz explain about it specifications & other details

2282


how can we construct building without foundation providing only grade beam at ground level

1697


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

2283


how much required strength of cement concrete bricks(size 230x115x75mm)

2000


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

2249


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

2079


Which is the best book for building construction?

1102


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1678


though u r a civil engineer, y r u interested in tcs???

2584


to minimize budget cost of building , what can i do

2258


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1984


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2455


material used for mendrel use to bend epoxy coated rebar

2295


yasser arfatcompleted his degree in civil from which university

2267


In which code the the maximum height of concrete casting has been explained

2865