Answer Posted / rajesh
dia of bar X (Stress)/(4 X shear stress)
d
Ld= (O X σs)/(4 X Ts)
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
why do we not deduct volume of steel to find actual volume of concrete in practical???
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
Define What is diversion tunnel in a dam?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what is E
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
IS code for grade of concrete for bamboo lintel????
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What is an ortho mode?
Who built the sears tower?