Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Lap Length??????

Answer Posted / syed zafar ul haq

50d

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate quantity of bricks in circular manhole with examples.

5683


Design a rectangular channel.

2905


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3765


States some of the commonly used commands in cad software’s?

1205


Soil bearing capacity formula

1723


How many mortar required for Brickwork of 1 Cu.m works??

1511


What are the different softwares used for cad?

1290


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

2016


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

2605


What are the different approaches in designing the floors of the service reservoirs?

1171


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1923


what values & beliefs have guided you in your career path

3281


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2616


How can I make justification between using concrete grade c35 compare c37?

1580


How is improve my knowledge in construction industries....

2129