Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much quantity of tile placing can be finished by one mason
per day?

Answer Posted / thanveer kanniyan

DEPENDS UPON THE SIZE OF TILE IT MAY VARY.

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1981


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9522


Difference between pre-tensioning and post-tensioning.

1181


Why nautical mile is different from statute mile?

1291


Define What are the uses of alloys in daily life and how are alloys made?

1317


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

1147


How to do rate analysis for concrete work including shuttering work?

2050


how is the reinforcement is distributed in triangular slab

2243


What things architect have to take care of before starting any project?

1289


How did street originate in the plumbing term street ell?

1029


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2861


very simple or less time consuming formula for reinforcement calculation by moment

1492


Civil engineering related

1973


Describe the sections included in a typical bill of quantities

2281


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

2361