Answer Posted / sabarish g
Because civil engineering means
CREATORS OF ALL CREATIONS
In sense we can able to create from nothing to anything.....
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
How can i display 5 asterisk and another 5 asterisk )?
How to calculate material and labor required for 100 m2 plaster?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what is the maximum number of course that can be laid according to IS code and the max height.
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is the Roll of Water Bonding under VDF road?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?