Slow setting admixture is used in mass concrete because of –
–
Answer Posted / abdur rasheed
slow setting admixture or retarder which is type-B according to ASTM 494 is used to slow down the setting time of concrete.Sometimes the batching plants are far away from the construction sites so in that case we have to use some chemicals to delay the setting time of concrete.
sugar is the commonly used retarder.Its usage depends upon the temperature of concrete,ambient temperature,dosage rate,type of admixtures etc
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Is there the dry coefficient of cement is constant?
How to check slab shuttering level.? Or check list for slab ?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is castigliano theaorem
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
What are the alternate material for steel, Sand and aggregate
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
what are the types of dimensioning?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
what is the type of earthing
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??