Answer Posted / achita rao
ELCB DECETS EARTH FAULT WHERE AS RCCB DECETS EARTH LEAKEAGE
& SHORT CIRCUIT
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what are the usual topology of transformers at different substations in the power system and why that particular topology is choosen. what are the limitaions of that topology?
What do you mean by pull of electromagnet?
what is the formula to calculate voltage drop/loss on 66KV Transmission Line?
Why hydropower is called renewable source of energy?
what is the difference between skin effect
What is domestic transformer? Draw the connection of domestic transformer.
can we do the star delta connection of capacitor for 3- phase motor starter.
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
how much UPS neutral erath leakage current.
What is an ideal transformer?
any one please tell taht what type questions will be asked in BHEL interview, i am having interview on 24th Dec, please send this to mail pradeepsistam@yahoo.co.in
What are the characteristics of negative feedback?
Is it a better option to procure screw type air compressor rather than reciprocating air compressor?If so, what is the reason?How should we select an air compressor(100 CFM)? Please mention the important parameters of air compressor.
What is the formula to calculate the size of Aluminium and copper cable?
Has someone here done a sizing for a generator (3 phase), its for a pumping station. If you have an example for standby/duty and both running (I) star delta (ii) Soft Starter.