11.The addition 742586 + 829430 = 1212016 is incorrect. It
can be corrected by changing
one digit d, wherever it occurs, to another digit e. Find
sum of d and e.
A. 6 [DCRU]
B. 4
C. 10
D. 8

Answer Posted / diffmail172@gmail.com.

c.10

Is This Answer Correct ?    7 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Find the correct choice if the sum of any 4 consecutive numbers is divisible by a number?

832


There are 5 questions based on a murder story.the questions concentrate on the seating arrangements of people mentioned.

804


one answer is 200/3 % it is perfectly correct wecannot recollec the prob. so place it blindly.

782


One skirt requires 3.75 yards of cloth. How many skirts you can make from 45 yards?

807


Average of 5 number is -10 sum of 3 numbers is 16,what is the average of other two numbers?

711






There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.

703


Find the next series: BC CE EG GK ?

981


In a two-dimensional array, X (9, 7), with each element occupying 4 bytes of memory, with the address of the first element X (1, 1) is 3000, find the address of X (8, 5).

914


which one of the following usages was a vedic development?

1960


In a car wheel, two spokes cover 15 degree. Then for the entire car,how many spokes are there?

776


Fill the empty slots. Three FOOTBALL teams are there. Given below the list of maches. played won lost draw Goals for Goals against A 2 2 *0 *0 *7 1 B 2 *0 *1 1 2 4 C 2 *0 *1 *1 3 7 the slots with stars are answers.

783


A boy scores 9 marks more than his friend in an exam and has 56% marks of the total of their marks. Calculate the marks scored by each of them.

766


During a given week an author spends 1/4 of his time preparing first drafts, 3/8 of his time editing the drafts and the rest of the time in preparing final drafts. If he works 48 hours during the week, how many hours did he spend in preparing final drafts?

788


A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

1064


There are 7 people who take a test among which M is the worst, R is disqualified, P and S obtain same marks, T scores less than S and Q scores less than P, N scores higher than every one.

746