11.The addition 742586 + 829430 = 1212016 is incorrect. It
can be corrected by changing
one digit d, wherever it occurs, to another digit e. Find
sum of d and e.
A. 6 [DCRU]
B. 4
C. 10
D. 8
Answer Posted / diffmail172@gmail.com.
c.10
Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
Find the correct choice if the sum of any 4 consecutive numbers is divisible by a number?
There are 5 questions based on a murder story.the questions concentrate on the seating arrangements of people mentioned.
one answer is 200/3 % it is perfectly correct wecannot recollec the prob. so place it blindly.
One skirt requires 3.75 yards of cloth. How many skirts you can make from 45 yards?
Average of 5 number is -10 sum of 3 numbers is 16,what is the average of other two numbers?
There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
Find the next series: BC CE EG GK ?
In a two-dimensional array, X (9, 7), with each element occupying 4 bytes of memory, with the address of the first element X (1, 1) is 3000, find the address of X (8, 5).
which one of the following usages was a vedic development?
In a car wheel, two spokes cover 15 degree. Then for the entire car,how many spokes are there?
Fill the empty slots. Three FOOTBALL teams are there. Given below the list of maches. played won lost draw Goals for Goals against A 2 2 *0 *0 *7 1 B 2 *0 *1 1 2 4 C 2 *0 *1 *1 3 7 the slots with stars are answers.
A boy scores 9 marks more than his friend in an exam and has 56% marks of the total of their marks. Calculate the marks scored by each of them.
During a given week an author spends 1/4 of his time preparing first drafts, 3/8 of his time editing the drafts and the rest of the time in preparing final drafts. If he works 48 hours during the week, how many hours did he spend in preparing final drafts?
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
There are 7 people who take a test among which M is the worst, R is disqualified, P and S obtain same marks, T scores less than S and Q scores less than P, N scores higher than every one.