cement consumption per square feet in multi storeyed
building
Answer Posted / cm rao
0.4 bag per sft construction of normal residential building.
it may go upto 0.8 bag per sft.for expensive buildings
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
how to calculate the scour depth
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
howto calculate the quantities of material used in fly ash brick after finding the volume??
Define What is rigging?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
1:4:8 pcc calculation 591 cu.ft
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
what are the ffactors you considered choosing the course?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What is meaning of tlc
what is the types of surveying?which type of survey carrying for type of work?