Answer Posted / sandeep bhardwaj
There is a new concept that in deformed bars there is no requirement of developement length but this is provided to ensuring the bond between concrete and steel.
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
What you understand by building codes?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
I have an span length 16 ft c/c
give me the rate analysis for Bituminous Macadam and SDBC
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
List out some of the software program that can be useful for architect?
what is the meaning of 40/20 src
What is the primary difference between adsorption and absorption?
what r the precaution for high in atp tempareture,low in atp tempareture
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Why are steel plates inserted inside bearings in elastomeric bearing?
how to calculate MR 9(derivation)
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
what is difference between GTS bench mark and temporary bench mark