Can anybody help me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates?
Regards,
Answer Posted / jasmin
Dear chatterjee sir,
Kindly help me by sending me the formats for quality checks
of common building materials like
cement,concrete,bricks,sand and aggregates.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between Hinged and pinned in Column ends
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what do you understand by M25 concrete
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
strength vs shape factor
What type of tensile strength is handling by crank in beam? Thanks.
How to arrive dry volume of concrete (1.52 to 1.57) ?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
How much cement and water required for cement selery????
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
detailed calculation of the amount of cement used?
How to calculate canal slope curvature qty!
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.