During shutdown of Steam Turbine,How do we cross the
critical speed?

Answer Posted / ankit

barring gear motor is used to cross the critical speed which is 20-25% of rated speed

Is This Answer Correct ?    3 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

By any way can we increase the B check hours from 300 to 500

1693


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

510


why do you consider yourself a suitable candidate for this position

6972


LAPT working in alternator / generator

2541


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1194






im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1472


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2760


what is the trip circuit supervision in an electrical meaning?

1439


What is difference between secondary Air & Tertiary Air and Their use.?

1474


explain how the third harmonic content of the magnetising current affects transformer design

2770


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1425


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

1948


what is the difference between compensated & normal drum level in boiler drum?

1286


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2974