Answer Posted / suresh
35.29cft=one m3
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
Time required for curing of wall tiles before fixing
What do you mean by bond? What are the different types of bonds?
How many feet are in 4 square yards?
how to preaper for interview wat they asked in interview give me idea
what is meant by shear center?????
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
what do you understand by M25 concrete
What is the use of mirror command?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097