Answer Posted / ashis paramanik
Bills may be of three types:
a)Intermediate or running payment
b)Running and Final payment
c)First and Final payment
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What is difference between engineering stress and true stress?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
The definition of national highway
How to find CN by using arcgis 9.3?
What is the difference between EPC,DBOOT and BOOT.
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
what is your role of in previous company as a construction manager
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What is OSHA compliance?
how many digree of freedom in four bar chain
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
How much quantity of rod binding work by a rod binder per day
why demand factor less then 1 ?
how much need sand and cement for 1 cft roof construction?