Answer Posted / ashis paramanik
Bills may be of three types:
a)Intermediate or running payment
b)Running and Final payment
c)First and Final payment
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the anchorage length of reinforcement.
why are you joining in this (applied post) job and your aim for this job
What Are The Steps Involved In The Concreting Process, Explain?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is pqc
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
How to calculate the force on a column of three story building. What should be the base concrete height?.
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
What quantity of 1.0 m3 bricks required?
How many mortar required for Brickwork of 1 Cu.m works??
How do you prepare Material Recovery Statement for deduction from contractors bills?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
what is the minimum compressive strength of clay brick
about higyway engineering
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?