Answer Posted / ateeq khan from pakistan
for example you have 10 CFT place and you need to change it to cm3. 10 divided by 35.32 10/35.32 and ur answer is 0.283 cm3.because 1cm3 is equal to 35.32 CFT.
| Is This Answer Correct ? | 1 Yes | 9 No |
Post New Answer View All Answers
why do we not deduct volume of steel to find actual volume of concrete in practical???
it is a corrected question." make a list of engineering property(properties) of soil.
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
how to nfind out the specific gravity of sand.aggregate,water please help...
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
what mean By core Billing
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
What is the Maximum %age of Steel in columns and beams ?
how much shouid be the rate for ready mix concrete per cubic meter
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is Density of cement, sand & aggregate ?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?