Answer Posted / mostafaghodrat
According to the load account. If there is no load
p. fee no load on the transformer is about 0.3 to 0.4
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How out of step protection relay works?
How we can come to know the substation range,without go through any name plate ?
sir please tel me how calucalte kwh if home taken load 30ams how maney kwh taken per day.and 3phase motor 5hp per hars how maney load teken and how mach kwh and forward me to electrical table for calicalte kwh and kvr and kvah
If symmetrical fault occurs at the terminal of a synchronous motor then how the motor will act...explain it..
why servomotor motor? where i apply for best output?
how to control dc motor?
Determine the BTU size of an aircon for 20 sq metre room
how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.
WHAT ARE THE EFFECTS OF SERIES RESONANCE AND PARALLEL RESONANCE ON THE CIRCUITS PARAMETERS?
What are diffrent type of road taxes?
how to select size of hardware for linking aluminium busbar is it depend on area of busbar or current flowing through bus bar
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
what will happen if i connect 12 volt battery with 24 volt battery charger.
how can motor both beasrings insulation resistance can be check?
i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper