In third party how sales order changes to purchase req.
automatically?
Answer Posted / vn naik
Schedulline categeory CS Order type should be NB
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance
can some body give me some idea on integrations of sd and sap crm service
Give examples for standard output types in sd.
Hi SD Gurus, what are the documents in which we use Output Determination starting with Sales order? Where do we use the output determination? I have been asked this question in a recent interview? It’s Urgent!!!!!! I have interview within 1-2 days? So, I request you to provide solutions to above question as early as possible? Your timely help would be greatly appreciated? Thanks in advance Regard
Mention what are the two places where you need to configure cin (country version india)?
The whse had to go to manual mode and we have been left with deliveries that were not created. Is VL10H the tcode I would use to upload data from an excel or text file to create the deliveries in mass? If so, what are the steps to follow? Thank you!
Give a definition of plant (in sap).
hi gurus, i have used variant configuration(a customer ordering a computer diff combination of monitor,cpu,keyboard) this is my scenario. i have taken and assigned(ct04,cl02,mm02) dov(10x11,11x12,12x13),colour(red,brown,grey),price(sdco,vko nd).now those were again assigned in cu01. can u provide solution urgent.
At which levels in the sales document can you have different incompletion procedures?
Do I have to change the update rules/source fields for the infostructure?
How we can do invoice split depending on item category in which scenario we will use?
Hi, Can anyone proivde the soluiton for the below senirio, thanks in advance. We are providing test services to various sites of a corporate. Now, we want to bill as a single bill point i.e. Corporate office. Single bill for each site will be generated. E.g. Panac Labs, New Delhi Head Office Panac Labs, Mumbai Lab at Mumbai Panac Labs, Kolkata Lab at Kolkata Panac Labs, Indore Lab at Indore In above case, we are cattering services to all four locations. However, New Delhi is the Head office and Lab too. Hence we will issue four bills addressed to Panac Labs, New Delhi. Outstanding and debtors will be maintained on A/c of Panac Labs, Head office. We also want to maintain sub- ledger base on sites
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
Define to which organizational element is central in shipping?
Explain ‘business area’?