Transducer Input 0 to 230 v ac
Output-0 to 10vdc Receiver Input 0 to
10 vdc and Output 4 to 20 ma How?
Answer Posted / carl_ellis
A 230Vac line voltage is converted to an instrumentation
level signal of 0-10Vdc in a converter.
That 0-10Vdc proportional signal is fed into some receiver
which re-transmits the input as a 4-20mA
signal. So now a 0-230Vac signal is a 4-20mA signal.
It isn't clear why the signal was not initially converted to
4-20mA, but that way things are, sometimes.
Carl Ellis
Measure First
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If fire would be inside the plant which fire detector is to detected the fire.
Q- What are the application in which PNP transistor is preferred over NPN ?
How an rtd work, and what volts/current goes to a rtd to measure the resistance?
in mass flow meter what is drive friquancy ?
How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?
-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
how to calibrate electro pneumatic positioner 8013 mil controls ltd ?gsr
What is difference of fanuc alpha series 16i and 18i controller.also what is differnce betn TC and MC controller
what is the procedure of O2 sensor(ABB) calibration?
can we copy the software from a transmitter using hht(hart 275) ?
i am preparing for BARC ,so plz mail me how to prepare for BARC. ALSO IF POSIBLE SOME RELATED QUESTIONS. MY MAIL ID IS khushi_4uall2003@yahoo.co.in
Any body have know try work calculation ???
Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..
you are on site,the plant trips,you are approached by operations,what do you do?