During shutdown of Steam Turbine,How do we cross the
critical speed?
Answer Posted / chanchal rajput
As we closed esv after that speed of the turbine goes to
slow down automatically we can not any thing as it cross the
critical speed , for short time vibration increase but after
that goes slow down and turbine stop .Some turbine run above
the critical speed and some below the critical speed .
| Is This Answer Correct ? | 0 Yes | 10 No |
Post New Answer View All Answers
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
operation
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
By any way can we increase the B check hours from 300 to 500
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
How We Calibrate the vaccum transmitter?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is restricted earth fault explain in details
LAPT working in alternator / generator
can dp type level transmitter work in under vaccum condition
why do you consider yourself a suitable candidate for this position
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?