For M25 concrete ,what is the maximum compressive strength
at 28 days ?
Answer Posted / vigneshkumar.m
above 25 N/mm
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how to nfind out the specific gravity of sand.aggregate,water please help...
what is civil all interview questions
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
what is the Asfalt test?in road constraction..?
What are the benefits of rcc pipes over steel designed pipes?
What is the cemnent ratio
What is the difference between linear dimension and aligned dimension?
What are the different theories of failure under static load?
what is the hanekom repairing material after concreting work
What will be weight of 0.5mm GI sheet per sq.ft?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Define What is unit weight of normal concrete?
Define What is the best type of wood glue?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?