Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is charge?

Answer Posted / ram prakash

charge a type of energy.It can also in many form of energy like chemical energy; electrical energy etc.

Is This Answer Correct ?    15 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir, can you give me full idea for computational fluid dynamices and how can work in CFD

1959


What should be done to prevent a safety valve to stick to its seat ?

1086


WHAT ARE EARTH MOVING M/CS? WHAT IS BATCHING PLANT? WHAT IS HYDRAULIC JUMP? WHAT IS TIPPER (EARTH MOVING M/C)?

2741


How can we calculate the per hour productivity of a hydraulic rock breaker,for excavator..

1597


What is a positive displacement pump?

1061


SIR I M STUDENT OF POWER ENGG CAN I GIV PSU XAM 4 NTPC AND WHAT WOULD B THE PROCEDURE

2155


why study in Michigan tech univ

1889


What does a rolling offset look like?

1168


What causes turbocharger surging?

2195


tell me about a time when u had too many things to do and u were required opinion prioritized your talks

1785


hi this is ravi , i was short listed in hal assistant engineer, now im going for interview can anybody help how is the interview for mechanical stream very urgent if anybody knows forward to me my mail id i.ravibabu2@gmail.com

2231


What is jet plane?

1142


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1815


How will you measure the eccentricity of the turbine rotor during running

2937


Why rockets using liquid hydrogen have higher specific impulse compared to liquid hydrocarbon ?

1113