Difference between wbm and gsb in road construction

Answer Posted / surajit dey

Wbm full form is water bound macadam and GSB fullform is granular sub-base.

Is This Answer Correct ?    151 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


how many litres of enamel paint required for 5000 sft of site?? 

1478


what energized you to complete your course?

1876


For what building Built-on balconies are preferable? What are the advantages?

719


can you give me the details of rate analysis of steel and concrete?

2466






What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1183


Define What is passive earth pressure ?

693


Which tests are performed on soil to decide the type of foundation to be provided.

1635


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1383


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

766


how to calculate the steel in 500yard

1886


What is the minimum size of the particles of silt soil?

794


What things you need to take care of before building a kitchen island?

730


how many spacers we need for 1 ton reinforcement? aprox.

4915


Explain soil analysis?

661