what are some possible sources of error in the CBR test?
Answer Posted / tsholofelo
Some possible sources of errors in the California Bearing
Ratio (CBR) test are worn test tools, trash in the test
area, recent rain, old stream bed, missing the standard
height during compaction, compacting slower or faster than
compaction rate, and hitting the mould against hard objects
in order to remove the contents after compaction can remove
it from calibration.
| Is This Answer Correct ? | 6 Yes | 11 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
How to calculate quantity of plum masonry in 1:3:7
What is Architect-Prepared Contract?
how to create our resume?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What is the biggest dam in america?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What are the different types of civil engineering?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
What is quantity of cement and sand required for 2000sqft of tiling?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
how i convert mm into standard wire guage (SWG)no.
whou haat goals do you have in your career