1 cum brick work CM1:6 how many bricks sand cement required
brick size 8"4"3"
Answer Posted / md. mainul islam
Bricks:667 nos
Sand:16.54 cft
Cement:2.20 Bag
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
Draw the cross section of a boundary wall and label its part with detailing?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What tor stands for in tor steel?
any book or article on pumped concrete.
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
In earth work 1300 cum soil how to calculate how many liters require in water
how much shouid be the rate for ready mix concrete per cubic meter
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
how to preaper for interview wat they asked in interview give me idea
Explain what is progress payment?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate