what is the criteria for placing reinforcement in footing
and slabs e.g which span have to place first.
Answer Posted / prabhakar trimukhe
first longer span reinforcement placing at bottom side
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the difference between a wood shake and wood shingles?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
Volume of 25kg putty bag & 40 kg putty bag volume??
In Rcc ratio calculation I wanted to know quantity of Steel also.
How to calculate 1 brss for RCC work
what are the duties of Site Engineer in work site?
what r you reqired for concrete baching plant?
cement and sand required for one block of size 0.23*0.15*0.46
Reinforcement details at hinged joint
How many days should curing of plastering, brick work and concrete
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how much cost of single coat 20mm thick plastering per sqre meter
What are the different approaches in designing the floors of the service reservoirs?
What is the diameter of the 3"inch nails?