You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / prabhakar trimukhe
because shuttring space or clear cover between bars and concrete thickness due protect the bars due to corrosion. due my experince
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What black man invented the clothes dryer?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
how to design and calculate materail quantity for concrete speedbreaker ?
Explain what is zoning permit?
How do you compute the volume of airflow?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
For what purpose bedding is used under storm water drains?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
how much shouid be the rate for ready mix concrete per cubic meter
What will be weight of 0.5mm GI sheet per sq.ft?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?