You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / rajesh.d.v.s.p.
i don't no in site but according to my knowledge if the column is with in the core there is no problem other wise any eccentricity u have change the design considered moment with respected to axial load
that was design the column with moment+axial load
P = P+ P.e
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what is anchorage length,lap length and (dont remember the last one)
how to calculate rate analysys of 1:6 plastering 10 sq m
What is quantity of cement and sand required for 2000sqft of tiling?
crank types
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
How can i do RCC rate analysis?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
how statics is different from dynamics
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What are the Types Of DPC and its Thickness used?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how we can find sieve #4 is 4.75mm?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How high should the water tank be to provide a 60 psi at base of this water tower?