how many labour is required for 1cum of concrete?

Answer Posted / mkg

a gang of 18 labour is required at a mixer machine for rcc work.

Is This Answer Correct ?    7 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

which formula used for calculate the area of segmental arch?

2451


water leak detection system question & answer

2070


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1339


can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1345


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1763






"Gates of the dams are generally designed of curved shape". Why?

1677


what is meant by residual strain?

1889


What is rate of concrete surface rendering work per sqm

1532


how many types of survey and what are levelling instrument?

1672


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1881


Why are separation membranes used between concrete pavement slab and sub-base?

926


Define relative co-ordinates?

773


How to plan a project

1827


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

4675


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

1907