Answer Posted / mkg
a gang of 18 labour is required at a mixer machine for rcc work.
| Is This Answer Correct ? | 7 Yes | 11 No |
Post New Answer View All Answers
How to calculate the quantity of ingredients of M20 grade concrete?
what is the clear cover for shearwall?
Please let me know what is the simplest way of Calculating Mix Designs
What applicable rate of wct in bihar
what are the duties of Site Engineer in work site?
Can we apply curing compound on ceiling (slab Bottom)
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Explain soil analysis?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
What will be weight of 0.5mm GI sheet per sq.ft?
what are the Task work of different labour.?
Define Workability ?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
howto calculate the quantities of material used in fly ash brick after finding the volume??
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.