You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?

Answer Posted / mkg

We have to go for chemical rebar of total no of steel bars at its proper location.

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

1924


What is different between DI Pipe and CI pipe?

1591


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

1659


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1592


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2272






what is the difference between natural draught cooling tower and induced draught cooling tower

1835


Permissible wastage of cement as per IS code ? In which IS code I get it?

1227


Ratio for 4500 psi concrete

1193


Why should pumping be not used in case of concreting works?

1001


how to calculate total cost for slab 35'×8'

1519


Define What is the origin of name Railway Sleepers?

831


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

1829


What is the diff between cad & cadd?

661


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1241


what is diffrence between catchment area,watershed and basin?

2510