You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / mkg
We have to go for chemical rebar of total no of steel bars at its proper location.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
detailed calculation of the amount of cement used?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
pile load testing procedure
Will water damage concrete?
how much cement sand n bricks required in im3?and how much in plaster?
What is the minimum size of the particles of silt soil?
specifications of fe500 steel
How many mortar required for Brickwork of 1 Cu.m works??
Advantage of Aluminum form work in terms of activities can be skip and cost too
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
Moisture content calculation for diff mix ratio's ??
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
what is the dimensions of river sand truck trailer or trolly ?
how to calculate mivan shuttering matrial
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.