Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the functional difference between DOME and R.C.C.,
where purpose of both covering roof?

Answer Posted / harmanpreet singh

DOME is mainly used for larger area to be covered specially circular, where we have to occupy all space.
Where as in RCC there is a hinderence produce by colomns
As DOME don't need support of beam.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

11532


which type of instrument included in plumbing work?name of instrument?

2081


How is make concrete cube?

1146


How cracks in concrete can be avoided?

1103


what is pile and deam foundation

2271


What is the origin of name railway sleepers?

1285


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4615


What is meant by engineering drawing?

1012


material used for mendrel use to bend epoxy coated rebar

2109


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2394


How are freeway bridges built?

1203


What is the Null Point of chimney in Power Plant

3682


Explain soil analysis?

1120


How to make a c++ program that converts any base to base 10?

2021


What is the use of offset command?

1092