Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

thermal power plants in steam using inlet of turbine.inlet
of turbine pressure and flow is same as boiler feedpump why
not use direct to turbine?

Answer Posted / devinder singh

BECAUSE STEAM TURBINE IT IS A DEVICE WHICH CONVERT HEAT ENERGY INTO MECHANICAL ENERGY SO WE HAVE REQUIRED SUFFICIENT HEAT , IT WILL COME FROM STEAM. BUT IN ANOTHER WAY WE HAVE DIRECT WATER USE IN HYDRO POWER PLANT BUT WE CANNOT PLACE HYDRO POWER PLANT IN ANY WHERE SO .....

Is This Answer Correct ?    8 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1858


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2489


Why superheated are started before I'd and rd fan?

2123


why airtel use + 24 volts and other operators use -48 volt

2570


what is restricted earth fault explain in details

1996


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2417


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1652


How to calculate power press toneage

2009


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3185


operation

1833


what is natural frequency of turbine shaft .

2231


procedure of how to generate power in solar plant.

1901


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1646


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1936


what is the difference between compensated & normal drum level in boiler drum?

1740