How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
Answer Posted / sagar
how to calculate water for brick work , plaster , flooring,
emergency.
| Is This Answer Correct ? | 16 Yes | 8 No |
Post New Answer View All Answers
what is the use in canals of longitudinal drains and cross drains in lining areas?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
procedure for preliminary selection of size of column of 5 storey building
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
rimmer in pile foundation
what is detail procedure of eccentric footing? plz. give solved exmple?
what is the formula for Mass of cement grout (Dg)=???
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how calculate the bearing from two coordinates?
what is the breaking strength of wall tiles
.5Ast