why we use minimum cement as given in IS mix design code
Answer Posted / rajesh.d.v.s.p.
if we use higher quantity of cement in concrete the heat of hydration will increases. due to cause of hydration cracks will be developed in concrete.the atmosphere moisture will passes through the cracks the steel will rested so this cuse the durability of concrete will reduce.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In jack arch floor, the rise is kept?
Explain how you can turn off the display for dimension in CAD?
How do you change a dimension value in solidsworks?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
IS code for grade of concrete for bamboo lintel????
What is the significance of cost estimate knowledge for an architect?
What is the density of most of construction materials?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What things you need to take care of before building a kitchen island?
how to calculate MR 9(derivation)
What is costing in 100squre feet bricks
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is passive earth pressure ?
What is proportion of PCC Grade G?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column