why we use minimum cement as given in IS mix design code
Answer Posted / rajesh.d.v.s.p.
if we use higher quantity of cement in concrete the heat of hydration will increases. due to cause of hydration cracks will be developed in concrete.the atmosphere moisture will passes through the cracks the steel will rested so this cuse the durability of concrete will reduce.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
How to estabilish reinforcement Steel rolling margin for a building projects ?
punj loyed and sapurjl palanjl
Why should appointment store person for project ? what is the benefits for company ?
what is the criteria for the finalisation of pavement thickness in road project?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
I have an span length 16 ft c/c
How to determine thee cut length for steel reinforcement bars in R.C.C design
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What is labor and material payment bond?
What is packing Factor ?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Define What materials were used to build the Golden Gate Bridge?