What is the proportioning by weight of 1:2:3 concrete mix
design of cement, sand, gravel, and water in metric for a 3000
PSI concrete strength and a target slump of 75-100mm?
Answer Posted / rajesh.d.v.s.p.
3000psi means M20 grade concrete
the ratio of m20 concrete is 1:1.5:3
total volume=1+1.5+3=5.5
total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
What is the per cu. mt. price of ready mix in Gujarat region.?
what is the difference between replacement of cement by groundnut shell ash
Why do you want to work here
water leak detection system question & answer
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how can we calculate steel value, depending on load
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
400 ku d/c clearess ketan hota hai?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in