Fineness Modulus of Sand
Fine Sand 1.5 - 2.0
Medium sand 2.0 - 2.5
Medium Coarse Sand 2.5 - 3.0
Coarse Sand 3.0 - 3.5
Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
For what purpose bedding is used under storm water drains, explain?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
whats is difference between anchorage length and development length
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
What is Refuse Area In High Rise Building ?
how to calculate freeboard in under ground water tank and technical details
What is the Hardness of M-40 grade concrete, general and theoratical
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What are the main reasons for conducting pull-out tests for soil nails?
Wats the formula of eccentric footing and how was calculated from concrete qty
What does civil engineering mean?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)