What is the proportioning by weight of 1:2:3 concrete mix
design of cement, sand, gravel, and water in metric for a 3000
PSI concrete strength and a target slump of 75-100mm?
Answer Posted / awadhoot
3000 PSI concrete strength equals to 20 N/Sqmm.
characteristic compressive strength of concrete.
Now refer to Table 9 "Proposrtions for Nominal mix
concrete", on Page no. 23 of IS 456:2000.
Here, for M20 grade concrete, the total quantity of dry
aggregates by mass per 50 Kg of cement is given as 250 Kg.
Considering proportion of fine to coarse aggregates as 1:2,
Fine Aggregates can be calculated as 83 Kg. Say 100 Kg, then
coarse aggregates will be 150 Kg.
Quantity of water per 50 kg bag of cement can be allowed up
to 30 litre to the Max. However, target slump of 75-100mm
can be achieved by following trial and error method.
Hence, for 1:2:3 proportion of concrete,
Cement:Fine Aggregates:Coarse Aggregates
50Kg : 100Kg. : 150Kg.
Here Fine Aggregates = sand and
Coarse Aggregates= gravel
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
what is right & short method of measurement of slab&beam
what is floating slab foundation?
Define angular dimension?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
How much quantity water should be placed in one cubic meter area?
Define What is rigging?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
what is anchorage length,lap length and (dont remember the last one)
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Why reinforcement done in shorter span in two way slabs
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available